• Based in Biddenden, Kent
  • Call: 01580 291195   or   07769 801728
Category: Modern Plastering
Re-skimming walls and ceiling
11 July 2022 - 15:23, by , in Modern Plastering, Comments off
Re-skimming walls and ceiling. Apply a coat of this product, over the walls and ceiling. Febond Blue Grip by Everbuild. And after the ceiling has dried, I am able to, re-skim the ceiling and walls, with British Gypsum Multi-Finish plaster. Leaving a smooth finish, ready for decoration. This project in, Brook. near Ashford. Kent. Was carried out in 2021.
The Old Lock Up. Cranbrook, Kent
28 April 2020 - 15:09, by , in Modern Plastering, Comments off
The Old Lock-up Cranbrook. Kent. This was the second lock-up in Cranbrook. 1850-1864. This project was to create a great new bathroom. The old plasterboard ceiling and walls have been removed, insulated between the studwork, with new plasterboard fixed and skimmed with Multi-finish plaster. To create a great new bathroom. carried out in 2019
Agricultural Building Conversion
15 December 2019 - 9:47, by , in Modern Plastering, Comments off
Agricultural Building Conversion. This traditional conversion project. Carried out by Unique Building Solutions Ltd. Who have taken this former agricultural building " A pigsty". With it`s ragstone walls and original oak beams, and made it into a great modern guest house. I was called in, to plaster between, the original oak beams and skim the plasterboard walls. The work was carried out at Egerton, Kent. 2019
Thistle Bond-it. The ceiling has been re-skimmed and decorated
28 July 2019 - 18:07, by , in Modern Plastering, Comments off
Thistle Bond-it. This British-Gypsum product, is being used here to re-skim an Artex stippled ceiling, and then skimming with Multi-Finish Plaster. Creating a smooth finished ceiling at Lenham, Kent. Carried out in 2019
New Fire place. This is after the fire grate and slate have been installed, to create a new fire place at Loose, near Maidstone, Kent.
8 June 2019 - 10:41, by , in Modern Plastering, Comments off
New Fireplace. This project was to remove the "classic" old fire surround, and replace it with a new contempory fire surround. Which involved installing a new lintel, and repairing the brickwork, then finally plastering, at Loose, Maidstone, Kent. The work was carried out in 2018
Float and set Kitchen all finished 2018
29 April 2019 - 8:16, by , in Modern Plastering, Comments off
This project was to float and set the block walls using materials from, British-gypsum to the newly built extension, so making the kitchen bigger. Work was carried out in 2018 at Lenham, Kent.
Glass blocks in rendered wall. 2010. Openings cut out, and glass blocks installed, then patched in with sand and cement render.
17 January 2019 - 9:44, by , in Modern Plastering, Comments off
Glass Blocks in Rendered wall. The areas in the rendered wall, have been cut out. Glass blocks installed, and patched back with a sand and cement render. The work was carried out in Iden Green, Kent. in 2010
Plasterboard linned Garage Skimmed
3 January 2019 - 10:10, by , in Modern Plastering, Comments off
Plasterboard lined gararage skimmed 2018. This garage in Marden near Maidstone, is ready for plastering with joints scrimmed and a skim of Multi Finish plaster
Re-skimming walls, in a 1890 house in Otham, near Maidstone, Kent
5 December 2018 - 16:01, by , in Modern Plastering, Comments off
Skimmed walls near Maidstaone. The walls have been prepared at this property, and a skim coat, approx 2/3 mm of plaster applied, leaving it ready for decoration by the client, at this 1890 property at Otham, near Maidstone, Kent.
The plasterboard ceilings have been Skimmed in this Eco friendly, Straw bale house, which was featured on the Channel 4 series, Building the Dream.
4 November 2018 - 10:01, by , in Modern Plastering, Comments off
Plasterboard ceiling in straw bale house. The plasterboard ceilings have been Skimmed with plaster in this Eco friendly, Straw bale house, which was featured on the Channel 4 series, Building the Dream. Work carried out in High Halden, Kent. in 2012.